A: Construction cannot commence until the S.78 Drainage Engineer’s report is adopted. This process may sound simple; however, the provisions of the Drainage Act are thorough and can be time consuming. According to the Drainage Act, there are three basic stages:

  • Report Consideration
  • Appeals
  • Report Adoption

See our Project Timeline for more details